![]() The new westbound lane will extend to Jones Boulevard. Reconstruction of the 215 Beltway will occur between Jones Boulevard and I-15 adding a lane in both directions for a total of five lanes in each direction. to limit impacts to the traveling public. Work requiring lane restrictions on 215 is expected to occur between 9 p.m. Work is expected to occur at various times of the day. The overall $84.6 million project is estimated to be complete in spring 2025. The bridge over Valley View Boulevard is being extended to the north to allow for realignment and widening of the Decatur offramp. This part of the project will take about five months for work on the offramp for westbound 215 at Decatur. The other ongoing closure associated with this project is Valley View Boulevard from West Martin Avenue to West Maule Avenue in both directions. to 5 a.m., and on the westbound 215 with just one lane open between Las Vegas Boulevard and Jones, Sunday through Thursday, 9 p.m. Meanwhile, overnight closures continue on the eastbound 215 Beltway, Jones to Las Vegas Boulevard, with only one lane open to traffic, Sunday through Thursday, 9 p.m. (Drivers who try to take the ramp from Las Vegas Boulevard will need to detour down to Tropicana Avenue, make a U-turn and then detour on Russell Road.) Motorists traveling from Las Vegas Boulevard will be detoured to Sunset Road or Warm Springs Road, depending on which direction they are headed. Motorists traveling on the I-15 South collector-distributor road to 215 West are encouraged to use Russell Road as a detour to Decatur and back to 215 West. Motorists traveling on I-15 North and South to 215 West will be detoured to Las Vegas Boulevard and have the option to use either Warm Springs or Sunset as detour routes to Decatur Boulevard and back onto 215 West. Starting Saturday, motorists will be detoured onto temporary ramps for the next year so bridges associated with the project can be constructed where the existing ramps are located. Saturday.Ĭlosures are required so that the contractor can complete detour paving and striping at 215 as part of the 215 Decatur to I-15 phase of the project. The 215 ramps from I-15 North and South to 215 West and Las Vegas Boulevard to 215 West will be closed at 10 p.m. Ramp closures are slated to start Friday as a major project begins to widen the 215 Beltway between Interstate 15 and Jones Boulevard in the southern Las Vegas Valley. Motorists will encounter more orange cones and likely delays this weekend as two road projects move into new phases.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |